Now booking Spring/Summer 27 development slots Reply to every enquiry within 24 business hours FOB · CIF · DDP to US & EU

Nine stages. Every one of them dated before you commit.

You get a time-and-action calendar at order confirmation, and a written work-in-progress report against it every Friday. No guessing where your goods are.

In short — how an order moves from enquiry to vessel

Every order follows a strict nine-stage workflow: 1. Enquiry & NDA (Day 0–1) → 2. Costing & FOB Quote (Day 2–5) → 3. Design & Tech Pack (Day 5–12) → 4. Proto Sample (Day 12–22) → 5. Fit & Size-Set Approval (Day 22–32) → 6. Gold-Seal PP Sample (Day 32–42) → 7. Bulk Fabric & Production (Day 42–90) → 8. 100% Check & Final AQL Audit (Day 90–95) → 9. Export Customs & Dispatch (Day 95–105).

01Day 0–1

Enquiry & NDA

You

Send us your enquiry — a tech pack, reference photo or mood board.

We

Counter-sign a mutual NDA and assign your named merchandiser.

02Day 2–5

Costing & FOB quotation

You

Confirm quantities, size ratios and target destination ports.

We

Build line-by-line FOB cost sheet breakdown (fabric, trims, CMT, wash, freight).

03Day 5–12

Design & tech-pack development

You

Share artwork files or brief our design team on collection concepts.

We

Create CADs, measurement specs, print placements and grading rules across US/UK/EU sizes.

04Day 12–22

Proto sample

You

Review initial physical proto sample and provide feedback.

We

Draft master patterns, stitch proto in substitute fabric, photograph from 6 angles before dispatch.

05Day 22–32

Fit & size-set approval

You

Fit sample on model, mark measurement corrections, approve grading.

We

Apply pattern corrections, produce size set in actual fabric, record tolerances.

06Day 32–42

Pre-production Gold-Seal sample

You

Review and sign off physical gold-seal sample with final trims and labels.

We

Seal 3 identical gold samples (Buyer, QA Floor, Cutting Room). Bulk cutting is locked until sign-off.

07Day 42–90

Bulk fabric & production

You

Receive weekly written WIP report every Friday with photo updates.

We

4-point fabric audit, shade segregation, cutting, inline sewing QC, finishing and iron pressing.

08Day 90–95

100% Check & Final AQL Audit

You

Appoint SGS, Intertek or QIMA for third-party final inspection if desired.

We

100% metal detection check, statistical final audit to AQL 2.5 major / 4.0 minor, issue audit report.

09Day 95–105

Export customs & vessel dispatch

You

Approve shipping documents and release 70% balance against scanned Bill of Lading.

We

Container stuffing, port customs clearance, dispatch B/L, Commercial Invoice, Packing List & COO.

Start your T&A Calendar

Book a development slot for S/S 27.

Chat with sourcing